Directed Electronics K10 Especificaciones Pagina 3

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 16
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 2
3
10. Drop some oil into the transducer sub until it’s full. Never insert syringe or any other
device into the transducer port more than 1/8”, as damage to transducer may occur.
11. Using oil pump, fill buffer tube assembly with a light mineral oil. Don’t try too hard
pushing the pump lever. Slow, but steady force until oil flows from the end of the tube,
that’s all you need.
12. Install buffer tube assembly on the gauge.
13. Install tandem sub on the gauge with external RTD.
If gauge does not have an external RTD, fill the tandem sub with oil, before installing it on
the gauge. Wipe the tandem sub out and wrap a scotch tape over the hole.
14. Install bull nose.
Now tool is ready and can be delivered to the well site.
AFTER ARRIVAL:
1. Connect the battery and note date and time of connection
2. Install battery housing hand tight and finishing tightening with wrenches. Do not over
torque.
3. Connect wireline socket.
4. If it is a gauge without external RTD, put gauge in vertical position and take the scotch
tape off the tandem sub hole.
5. With the lubricator pressured up, allow the gauge at least 15 minutes within the lubricator,
to stabilize before running in the hole.
6. If a static gradient is being run, allow at least ten minutes per stop to allow the gauge to
stabilize and to provide for a sufficient number of samples to be recorded.
Note: The tool should not be pulled in or out of the hole faster than 50 m/min.
AFTER THE SURVEY:
1. Pull gauge out of the well.
2. Wash down exterior of tool and wipe dry.
3. Remove battery housing and disconnect the battery (note the time and date).
4. Disconnect tandem sub from the gauge.
5. Disconnect buffer tube assembly.
6. Wash down nose of tool, tandem sub and buffer tube assembly with solvent.
7. Flush transducer port with solvent using syringe and allow to drain.
8. Flush and fill buffer tube assembly with clean silicone oil and set aside.
Vista de pagina 2
1 2 3 4 5 6 7 8 ... 15 16

Comentarios a estos manuales

Sin comentarios