Directed Electronics equalizer 2500 Guía de usuario Pagina 108

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 107
Post-Run Procedures
98
Part # 15035786 Rev. D
Introduction
Post-run procedures include the removal and weighing of reagents, and an instrument
wash. A water wash is required after each run, with the option after a high output run to
perform a maintenance wash instead. Illumina recommends a maintenance wash.
Regular instrument washes ensure continued performance in the following ways:
} Flush any remaining reagents and sample from the fluidics tubing and sippers.
} Prevent salt accumulation and crystallization in the fluidics tubing and sippers.
} Prevent cross-contamination from the previous run, including cross-contamination
after switching modes.
NOTE
A water wash performed at the end of a run washes the system and checks fluidics. When
setting up a run, the software confirms that a water wash or maintenance wash has been
performed within the last 24 hours. A maintenance wash is required every 10 days. When 10
days elapse after the last maintenance wash, the software prompts you to perform a
maintenance wash.
Vista de pagina 107
1 2 ... 103 104 105 106 107 108 109 110 111 112 113 ... 153 154

Comentarios a estos manuales

Sin comentarios