Directed Electronics equalizer 2500 Guía de usuario Pagina 68

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 67
Perform a TruSeq v3 Run
58
Part # 15035786 Rev. D
Position Tubing and Start Prime
1 Remove the 8 waste tubes for the appropriate flow cell from the waste container.
Do not include the 8 tubes for the opposite flow cell or the tube for the condensation
pump.
Figure 28 Position Tubing
A Flow cell waste tubes for reagent positions 1–8
B Condensation pump tubing (do not remove)
2 Place waste tubing into an empty 15 ml tube, 1 waste tube per 15 ml tube. Priming
waste is collected and measured after the priming step.
3 Select Start Prime. The priming screen opens and the priming step begins. Monitor the
progress of the priming step from the priming screen.
4 When the priming step is complete, measure the collected waste and confirm that the
volume in each tube is 1.75 ml for a total of 14 ml. The total is calculated as follows:
250 µl for each SBS position except position 2 (250 x 7 = 1.75 ml)
1.75 ml for each lane (1.75 x 8 = 14 ml)
5 Record the results on the lab tracking form.
6 Return the waste tubing to the waste container before proceeding.
7 Select Next.
Vista de pagina 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 153 154

Comentarios a estos manuales

Sin comentarios