
Perform a HiSeq v4 Run
34
Part # 15035786 Rev. D
Position Tubing and Start Prime
1 Remove the 8 waste tubes for the appropriate flow cell from the waste container.
Do not include the 8 tubes for the opposite flow cell or the tube for the condensation
pump.
Figure 15 Position Tubing
A Flow cell waste tubes for reagent positions 1–8
B Condensation pump tubing (do not remove)
2 Place waste tubing into an empty 15 ml tube, 1 waste tube per 15 ml tube. Priming
waste is collected and measured after the priming step.
3 Select Start Prime. The priming screen opens and the priming step begins. Monitor the
progress of the priming step from the priming screen.
4 When the priming step is complete, measure the collected waste and confirm that the
volume in each tube is 1.75 ml for a total of 14 ml. The total is calculated as follows:
• 250 µl for each SBS position except position 2 (250 x 7 = 1.75 ml)
• 1.75 ml for each lane (1.75 x 8 = 14 ml)
5 Record the results on the lab tracking form.
6 Return the waste tubing to the waste container before proceeding.
7 Select Next.
Comentarios a estos manuales