Directed Electronics equalizer 2500 Guía de usuario Pagina 97

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 96
Load and Prime Reagents
HiSeq 2500 System User Guide
87
Load a Priming Flow Cell
NOTE
Use a used flow cell to prime reagents. Do not use the flow cell that you want to sequence.
1 Rinse a used flow cell with laboratory-grade water. Dry it with lens cleaning tissue or
lint-free tissue.
2 Clean the flow cell using alcohol wipes and lens cleaning tissue.
NOTE
Do not remove or replace the manifold gaskets.
3 Place the used flow cell on the flow cell holder with the inlet and outlet ports facing
down and the barcode on the right. Make sure that the arrow on the left edge of the
flow cell, which indicates flow direction, points towards the instrument.
4 Gently slide the flow cell towards the top and right guide pins until it stops.
Figure 39 Flow Cell Positioned Against Top and Right Guide Pins
A Top Guide Pin
B Right Guide Pins
NOTE
Remove your hand from the flow cell before engaging the vacuum switch to prevent
possible alignment drift over time.
5 Slowly move the flow cell lever to position 1 to engage the vacuum and secure the flow
cell into position. When the flow cell lever is green, the vacuum is engaged.
Vista de pagina 96
1 2 ... 92 93 94 95 96 97 98 99 100 101 102 ... 153 154

Comentarios a estos manuales

Sin comentarios