Directed Electronics equalizer 2500 Guía de usuario Pagina 42

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 41
Perform a HiSeq v4 Run
32
Part # 15035786 Rev. D
Figure 12 Flow Cell Positioned Against Top and Right Guide Pins
A Top guide pin
B Right guide pins
5 Slowly move the flow cell lever to position 1, which engages the vacuum and secures
the flow cell into position. When the flow cell lever is blinking green, the vacuum is
engaged. If the lever is not green, see Possible Run Setup Problems on page 129.
Figure 13 Flow Cell Lever in Position 1
6 Wait for about 5 seconds, and then slowly move the flow cell lever to position 2 (far-
right). When the flow cell lever is solid green, the manifolds are in position and the
flow cell is ready for use.
Vista de pagina 41
1 2 ... 37 38 39 40 41 42 43 44 45 46 47 ... 153 154

Comentarios a estos manuales

Sin comentarios