Directed Electronics equalizer 2500 Guía de usuario Pagina 119

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 154
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 118
Shut Down the Instrument
HiSeq 2500 System User Guide
109
Shut Down the Instrument
Shut down the instrument only if you do not plan to use it within the next 10 days or
more. If you plan to use the instrument within the next 10 days, see Idle the Instrument on
page 108.
Use the following procedure to prepare fluidics safely and shut down the system.
1 Perform a maintenance wash to flush the system. For more information, see Perform a
Maintenance Wash on page 100.
2 Remove the flow cell from the flow cell stage.
3 Using an alcohol wipe or a lint-free tissue moistened with ethanol or isopropanol,
carefully wipe the surface of the flow cell holder until it is clean.
CAUTION
Do not allow alcohol to drip into the vacuum holes or around the manifolds. Use a low-lint
lab tissue to dry the stage, if necessary.
4 [For high output modes] Load 10ml laboratory-grade water in each reagent position in
the reagent racks. Then lower the sippers.
5 [For Rapid Run mode] Load 10ml laboratory-grade water in each reagent position, and
1 ml laboratory-grade water in each loading station position. Then lower the sippers.
6 Turn off the instrument.
7 To restart the instrument, load water in all reagent positions, turn on the instrument,
and perform a water wash. For more information, see Perform a Water Wash on page
104.
Vista de pagina 118
1 2 ... 114 115 116 117 118 119 120 121 122 123 124 ... 153 154

Comentarios a estos manuales

Sin comentarios